Nemaha-Marshall Electric Coop- Design/ installation of substation AMI equipment, and design/installation of AMI communication system.
Sedgwick County Electric Coop – Substation construction of a 138 kV substation near Maize, KS.
Lyon-Coffey Electric Coop – Design/ installation of substation AMI equipment, retrofit existing meters with AMI modules, and meter change-out.
LJEC – Design/installation of substation AMI equipment, design/installation of AMI communication system, retrofit existing meters with AMI modules, and meter change-out.
City of Fredonia – Design and mini-substations and distribution line associated with new substation. Sedgwick County Electric Coop - Design/installation of AMI communication system.
Rolling Hills Electric Coop – Installation of substation AMI equipment and design/installation of AMI communication system.
CMS Electric Coop – Meter testing for instrument rated meter installations.
City of Scranton – Meter testing for instrument rated meter installations and repair of meter installations.
LJEC – Replacement of decorative street lights, foundations, conduit, and wiring at Fort Leavenworth.
Black and Veatch – SCADA technical assistance with master station and data concentrators.
Victory Electric Coop – Manage design of 115 kV substation and installation of substation near Dodge City, KS
LJEC – Removal of transclosures and installation of 3 phase padmount transformers at various locations.
LJEC – Removal of paper-lead primary UG cable and the installation of 2 miles of 750 MCM primary UG cable in new 6" conduit at Fort Leavenworth.
LJEC – Installation of all UG primary/secondary and associated equipment for new sub-divisions at Fort Leavenworth serving over 100 residences.
Southern Pioneer Electric – Installation of a 34.5 kV substation near Coats, KS.
Southern Pioneer Electric – Modifications to 5 substations for erosion and oil containment.
Radiant Electric Coop – Move an existing 69 kV substation to new location.
LJEC – Design/installation of SCADA system including communications at Fort Leavenworth.
Radiant Electric Coop – Installation of a new 69 kV substation near Fredonia, KS
Radiant Electric Coop - Design/installation of substation AMI equipment, design/installation of AMI communication system, retrofit existing meters with AMI modules, and meter change-out.
Radiant Electric Coop – Stake distribution line for highway project.
Rolling Hills Electric Coop – Stake distribution line for highway project.
Victory Electric Coop – Stake over 900 miles of distribution line for two FEMA projects.
Rolling Hills Electric Coop – Stake distribution line for FEMA project.
Brown Atchison Electric Coop – Stake over 250 miles of distribution line for FEMA projects.
Heartland Electric Coop – Stake distribution line for FEMA project.
CMS Electric Coop – Installation of control wiring and protective relaying associated with transformer change-out near Liberal, KS.
DS&O Electric Coop – Installation of new 34.5 kV substation near Junction City, KS
Flint Hills Electric Coop – Modification to 34.5 kV substation in Grandview Plaza, KS.
CMS Electric Coop – Design/installation of SCADA system including communications.
CMS Electric Coop – Installation of 115 kV Substation near Liberal, KS.
Sedgwick County Electric Coop – Modification of 69 kV substation for new transformer, circuit switcher, protective relaying, and bus near Wichita, KS.
Heartland Electric Coop – Installation of 34.5 kV substation near Mound City, KS.
Prairieland Electric Coop – Installation of 34.5 kV substation near McDonald, KS. Ninnescah Electric Coop – Installation of temporary 34.5 k V substation near Greensburg, KS after tornado.